9*9 1:4:8 ratio using for p cc work please tell quantity
40mm aggregate ,sand &cement
Answer Posted / dhananjay yadav
.55m3
Is This Answer Correct ? | 0 Yes | 6 No |
Post New Answer View All Answers
cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com
how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you
cause of cylinder test failure
Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?
How to determine spacing of bars in slabs or beams
hai, kindly send anyone for output workers format details for construction project in foundation to finishing.
how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail
Time required for curing of wall tiles before fixing
In earth work 1300 cum soil how to calculate how many liters require in water
If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)
What is meant by a context menu in a cad software?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs
Which code is used for tor & tmt steel bar?
In the roof of a pumping station explain briefly the components of a waterproofing system?