what"s the responsibilities for QC(quality controler)in high
rise buildings?

Answer Posted / deepak

To Check the Quality work at each stage as per IS Code or the Vendor Methodology

Is This Answer Correct ?    10 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

For a washout valve why are two gate valves required in normal practice?

672


Ratio for 4500 psi concrete

1182


Differentiate orthographic and isometric projections?

643


whats is difference between anchorage length and development length

1375


How you can use different dimension tools in cad? What are the different dimensions available?

681






How to calculate the area in squarefeets ?How much area of sqft for this measurements?East 53.3ft West 54ft North 47.7ft South 51.1ft ?

1443


What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?

2248


sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience

1939


Can we apply curing compound on ceiling (slab Bottom)

362


How is make concrete cube?

702


it is possiblee to produce concrete with out cracks...

1477


115mm thickness brick work how to required mortar

1630


I want some common questions which have been asked in interviews of NTPC Limited,Satluj Jal Vidyut Nigam Ltd.,and Bharat Heavy Electricals Ltd.

1786


usually hand broken stones are used for cement concrete 1:4:8 in foundation of single /two story houses with a view of economy in construction.what advantages it will give if you use machine crushed stone in place?

1697


Discuss some applications of modular elasticity?

753