what"s the responsibilities for QC(quality controler)in high
rise buildings?
Answer Posted / deepak
To Check the Quality work at each stage as per IS Code or the Vendor Methodology
| Is This Answer Correct ? | 10 Yes | 2 No |
Post New Answer View All Answers
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
what is right & short method of measurement of slab&beam
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.
what is the difference b/w full length and cutting length?
Can we use the flyash bricks in brick bat coba?
A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals
how to identify the failure of building by expansive soils
How about the temperature of grade 35A concrete? Does it depend on the ambient temperature?
Detection of a beam & a girder areββββ
How can i display 5 asterisk and another 5 asterisk )?
Concrete cover for slab, column, beam and footing?
how much quantity of cement,sand and water required for 1 sq feet flooring work .
What is the snap size in civil and how can we create it?
hai, kindly send anyone for output workers format details for construction project in foundation to finishing.
Formula of mid span bar