what"s the responsibilities for QC(quality controler)in high
rise buildings?
Answer Posted / deepak
To Check the Quality work at each stage as per IS Code or the Vendor Methodology
Is This Answer Correct ? | 10 Yes | 2 No |
Post New Answer View All Answers
For a washout valve why are two gate valves required in normal practice?
Ratio for 4500 psi concrete
Differentiate orthographic and isometric projections?
whats is difference between anchorage length and development length
How you can use different dimension tools in cad? What are the different dimensions available?
How to calculate the area in squarefeets ?How much area of sqft for this measurements?East 53.3ft West 54ft North 47.7ft South 51.1ft ?
What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
Can we apply curing compound on ceiling (slab Bottom)
How is make concrete cube?
it is possiblee to produce concrete with out cracks...
115mm thickness brick work how to required mortar
I want some common questions which have been asked in interviews of NTPC Limited,Satluj Jal Vidyut Nigam Ltd.,and Bharat Heavy Electricals Ltd.
usually hand broken stones are used for cement concrete 1:4:8 in foundation of single /two story houses with a view of economy in construction.what advantages it will give if you use machine crushed stone in place?
Discuss some applications of modular elasticity?