Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to convert farad to kvar.
both are the unit of capacitor.

Answer Posted / dan

var = reactive power, microfarad = capacitance
var = reactive current x voltage = (V/Xc) x V
var = V² x 2&#1051;fC
Where f = frequency (Hz)
C = Capacitance (&#956;F)
Xc = capacitive reactance = 1/(2&#1051;fC)

Is This Answer Correct ?    20 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the ratio of true power to apparent power in an ac circuit?

1149


A parallel flow heat exchanger will perform better than a counter flow heat exchanger. State if the statement is true or false.

1267


3Cx240 & 3Cx300 sqmm Al. cable from lv side. What is the calculation for this cable??

1413


for a 400kv t/m line with 10 ampere current will corona occur?

2200


what is the voltage rating of chiller unit sensors

2784


How does a transformer contribute towards the widespread popularity of ac system over dc?

1115


What will happen to the protection and metering, if the polarity of a single or two PT/PTs in three phase system is reversed? Please provide reference if any.

2198


What will happen if the armature resistance is in minimum position and the field resistance is in maximum position while starting the motor

1636


A 7 storey building has a floor area of 35,000sq.ft on each storey. On the ground floor 11KV electrical sub-station is to be erected. A load of 3kw for every 400sq.ft (p.f is 0.8) is proposed for each floor. fire pump 7.5hp, water pump 5hp, lift 2 nos, each 10hp and 20shop load of each shop is 5kw. calculate a. load each floor b. total load of building c. L.T feeders for aech floor and from transformer to main. d. distribution diagram e. capacity of sub-station/capacitor bank f. line diagram

2821


How to know Resistance and Reactance value of main and aux winding of single phase capacitor start capacitor run induction motor to find capacitor value?

2050


What is size 00, 01, 1 etc., in HRC fuse types?

2389


What is the difference between isolators and electrical circuit breakers?

1210


How to Preparation of online test

1707


How to calculate VA rating for CT or PT or Control Transformer?

2865


can u give me a brief idea about power line carrier communication ??

1999