What height of a 3.5 m high 300 x300 mm proposed col. can
be casted at a time ?
Answer Posted / girish rawat
you can cast up to 4 mts of column if you have reqd
supporting system for the same. As for the IS you cannot
pour concrete more than 1.5 mts as segregation and self
compaction takes place. For the columns you there is no
issue as the concrete doesn't drop to the bottom at once. it
is interrupted by stirrups all the way.
This is based in practical experience and we have got it right.
Secondly nowadays there is Mivan Shuttering where you cast
the entire slab and column at one stroke.
Keep moving with new technology, you will save time and the
quality will be better if the mix is homogeneous lesser joints
Is This Answer Correct ? | 4 Yes | 3 No |
Post New Answer View All Answers
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
how to stop beam concrete between column
How is the strength of cement measured?
WHAT GOAL DO YOU HAVE IN YOUR CARRIER?
How to calculate material and labor required for 100 m2 plaster?
what is the use of water bar in water tank and is this an extra item in estimate?
how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution
What is Base Shear ?
What is the density of 1:1.5 (Cement:sand) ratio in plaster? And Conversion in 12.5 mm thickness per square meter? Howmany Kg of Cement square meter in ratio of 1:1.5?
How much cement and water required for cement selery????
What is rate of concrete surface rendering work per sqm
What is the wall thickness of NP-3&NP-4 hume pipe as per I.S code
how many minimum admixtures are used in water froofing structures
How much cement will require for 1Rmt Skirting laying
How will you Engage Labours on Site?