At wht stage in the SDLC testing should be started?
Answer Posted / y.s.v.r.varma
Actually dr r 2 types of testing r dr
1)Conventiontional testing
2)UnConventional testing
1)Conventional testing start after the development phaze in
SDLC
2)UnConventional testing Start at the beging the starting
of the project Means in the Requirement phaze itself
If ny one having doubts about these
mail me :ysvrvarma@gmail.com (OR) Call me :09949642465
Is This Answer Correct ? | 3 Yes | 5 No |
Post New Answer View All Answers
Field level test cases are developed using AF TOD to validate individual fields on a screen using a black box testing methodology. IN THIS CONTEXT WHAT IS "AF TOD"
What are the table contents in testplans and test cases?
What is the difference between quality assurance and software testing?
What is the rule of a "test driven development"?
What is binary portability testing?
What is the difference between compatibility testing and cross browser testing?
What is is External Quality Assurance (EQA) and Final Inspection (FI)?
What is agile testing and what is the importance of agile testing?
prepare functional requirements and design test cases for a given business requirement as follows(consider all the implicit requirements): A message portal is given,Login into that, check for any e_mail in inbox-if present reply,if not compose a mail and send it.
Explain functions of quality assurance department.
What is difference between qa, qc and software testing?
What is test metric is software testing and what information does it contains?
What are the challenges faced with the 1+ years experience team.
What is a test case template?
What is the role of qa in a project development?