when a primary current injection test is required, it is
accomplished by what?

Answer Posted / mohammad farman khan-abu dhabi

Primary current injection test require at time of
commissioning to distrubution switchgear.High pot theory.

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

in my industry we are using 3 step up transformers for induction heaters..i.e 415/580v and other are 11/440v.in power consumption does a step trnsformer makes any difference compared to step up?? plz explain

1438


how does ELR works? explain

2155


What is difference is of VSD,VFD,VSDS, are they the same as the direct current to control dc using above mention

998


Why the arms of delta in a delta-wye power transmission system are kept constant??

1419


what is rating boiler

1567






describe the constructional features of an auto transformer and its principle operation

1808


Ratings of power transformer,Distribution transformer.

1103


What is resolution of a measurement?

732


What is core CT & it's function?

1744


define as synchronous generator

1701


bsec exam syllabus (mis)

733


what is two point starter?

1646


hi, in the event earth grounding is not available in a project, is there any other way to make the elcb work? fyi, i have an instant water heater (6.5kw) installed, however if there is grounding in the heating element inside the heater assembly, i will get grounded. thank you in advance to those who will answer my question.

1522


area control error

1293


what is meant by vector group of a transformer? How can it be derived?

1521