Answer Posted / v.suresh
Material Requirement Planning is a Computerized Inventory
Control.
it need somme input and you get output of the product.
Input as BOM,Aggeragate Planning,MPS
output as Delivery time of our product and Demand of the
product.
| Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
Output with different language is it possible to have two delivery notes in two different languages?
Give examples for standard output types in sd.
What is the difference between sd account key and fi account key?
Infostructure filling we have two company codes and new infostructure s004 for filling. We must fill it with data from first cc only. Is there any problem if the people who create orders, deliveries, and billing of second cc work at this time?
How can we configure Input Tax in SD?
What sap systems have integration capabilities with sap transportation management? : transportation management
Send me some real time tickets in sap sd with there solutions by link
Name the influencing factors for pricing procedure determination during sales order entry?
IF u have worked on EDI IDOC, while sending PO to vendor how u connect to the system. Tellme the entire design and steps of the screen. how it looks.When i told we need to create port, partner profile, outbound idoc process. Interviewer not satisfied.
How is the item text copied from sales order to delivery?
How can a customer can connect his SAP ECC system to his SAP CRM system
What are the views in a material master?
We want to explode bill of material automatically at time of order entry and explode an equipment bom in the sales order. What are the setting required?
Explain what is the difference between sap credit memo request and sap credit memo?
Define tax determination rules