In which doc do client give the VUser limit & Parameterization?
Answer Posted / ravi v v
You are partially right. But in more contrast, or in real
time, Client may specifies these things in BRD Document, in
a seperate section called as "Non Functional Requirements".
If Client doesn't specify these in BRD, then we suppose to
understand that we may get a seperate document called
as "Performance Requirements"
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How is automated correlation configured?
How do you decide the number of load generator machine required to run a test?
What is the difference between performance testing and performance engineering?
When the rendezvous point is insert?
What is x-windows?
What kind of problem we can face regarding hardware, software, network and memory bottleneck during the performance test?
What are the four selection methods when choosing data from a data file?
What is the loadrunner start-transaction and its syntax?
What is lr_output_message?
While scripting you created correlation rules for automatic correlation. If you want to share the correlation rules with your team member working on the same application so that he/she can use the same on his workstation, how will you do that?
What are the different components of loadrunner?
When the loadrunner controller open the winrunner file then what is the location of the winner configuration file?
You have created several auto-correlation rules. A new tester on your team is preparing to record a group of scripts on the same application on his workstation. What can you do to provide the tester with the correlation rules?
What are the documents your using ,and how your distibute the users
What is a ramp up and how it can be set?