for a 11kv transmission line what capacity of CTs & PTs are
required?

Answer Posted / alternate_reality

A 100/5 Amp CTPT can be installed for metering purpose in
Indsustries...

Is This Answer Correct ?    2 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

can some one clearly explain why -48 volt DC use in telecom site????

1227


If I have 3 essential main switch board and 3 incoming electricity ,but only 1 genset running is that possible.

1142


We have received supplies of the ordered material. payments against the supplies also released. Where ST paid 4% against form C. Meanwhile it has been observed that 25% of material supplied was defective. Please suggest whether the issuance of C form from our side would be stopped till settlement of liabilities.

1463


why do we lay up the core of a cable?

1609


What effect does a very low impedance have on the Voltage regulation? On the short-circuit current?

5831






What is difference between mcb and mccb.

645


how to meas-our losses for L.T & H.T

1686


What is a slack bus?

646


i have been tasked with a design of protection, metering and control(PMC) relay panel extension to accommodate all PMC relays.There is an already existing panel where this one will be built.What are the design aspects for this kind of project? thank you.

1602


what is meant by twilight switches 7 where its applicable ?

1420


what is meant by poly phase induction motor ? how its operating by single phase or three phase?

1724


What do you mean by Stimulastion Test in Diesel Genarator / Why & when it's conducted ?

1215


A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.

1342


trasnfarmaer core make

1531


how does it help for selection of a transformer.

1364