Do your single-level BOMs represent production levels and do
you keep your BOM header materials in stock? If not, do you
produce non-stock items, or are some assemblies just used as
structural elements in a BOM?
Answer Posted / nvt
Yes
We can use the phantom material which is not produce but
have a stuctural element in the BOM
Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
What are the MRP master data?
What are the ‘bom categories’ supported by sap?
How to create PRT master record?
What is sap pp?
What is meant by payscale structure? How did you configure the payscale structure?
What are dynamic actions? Give a few examples. What are it’s you used in them?
Can we create production order without bom and routing ?
What is Phantom Assembly?
Explain different inspection type you used .
What are some important tables used in pp (production planning)?
Integration between PP and SD module.
Can’t one material be assigned to more than one operation in a routine?
We want the system to run a single level mrp automatically on receipt of sales order. How to configure triggering event based mrp?
Explain customer Independent requirement .
What is primary cost and secondary cost?