Do your single-level BOMs represent production levels and do
you keep your BOM header materials in stock? If not, do you
produce non-stock items, or are some assemblies just used as
structural elements in a BOM?

Answer Posted / nvt

Yes
We can use the phantom material which is not produce but
have a stuctural element in the BOM

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the MRP master data?

1234


What are the ‘bom categories’ supported by sap?

664


How to create PRT master record?

1530


What is sap pp?

658


What is meant by payscale structure? How did you configure the payscale structure?

584






What are dynamic actions? Give a few examples. What are it’s you used in them?

579


Can we create production order without bom and routing ?

666


What is Phantom Assembly?

1085


Explain different inspection type you used .

1327


What are some important tables used in pp (production planning)?

607


Integration between PP and SD module.

989


Can’t one material be assigned to more than one operation in a routine?

554


We want the system to run a single level mrp automatically on receipt of sales order. How to configure triggering event based mrp?

650


Explain customer Independent requirement .

1672


What is primary cost and secondary cost?

1253