Hi Experts, I am an SAP -SD consultant . I have created
new enterprise structure. I am able to create a sales order
with new enterprise structure but I am receiving an error
message during creating delivery T-code: VL01n which
says " Material 'XXXXXXXXX' does not exist in storage
location plant-'SHIV' Storage location-'KVSK'. I am also
receiving another error message like "The storage
location is not defined for delivery item 00010". How to
resolve this issues? How to make my storage location work
for my new Ent Structure? What are the settings required to
make items picked for delivery in TRansfer order t-code :
LT03.Please provide detailed procedure & neccessary t-codes
and explanation (if required) to avoid the above errors.
Warm Regards
Answer Posted / prashant
Make sure you have done your assign part with plant and check the TC MB1C to make sure storage location is simmilar in your material master data MM02
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
A Client wants to connect his SAP ECC system to his SAP CRM system. What do you want to do to enable the integration?.
How to do customization of rebate processing in sap sd????
What is the integrated areas in sd and fi, sd and mm, sd and pp in both implementation and support projects?
Which organizational element is central in shipping?
Explain what is sap posting period? What is the transaction code to open and close posting period?
What is product attributes?
9. Any three major issues faced in the support project? what kind of issues they were
What is higher level item category?
Where is the logic that controls this and how do we change it?
can one have multiple packing for delivery? answer is yes , but where we maintain this? wt is the process?
WAHT IS THE USE OF TAKING IDOC FOR DATA TRANSFER WHEN WE CAN DO IT THROUGH OTHER MODE
Tax jurisdiction processing is a close link between which two modules?
How many tickets you have solved till date? can you please elaborate it with solutions?
what is eligibilty concept for discounts?
I have a scenario where the our unit of measure is Pc. The conversion is 1pc = 2.9768 m2. Now the client is saying that he will give the prices in Cubic meter. The current requiment is we have to derive a conversion ratio between pc (m2) and cbm. Please advice.