Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Laboratory experiments conducted in Mumbai on a particular
mix showed a
strength of 33 MP a for a fully matured concrete. Find
whether formworm
can be removed for an identical concrete placed at Jammu at
the age of 15
days when the average temperature is 60C. The stripping
stress in concrete

Answer Posted / buntychandwani

First thing the question is not completely and correctely
typed. The stripping stress in concrete in missing and also
how 60 deg temp will be possible in Jammu & Kashmir.
Let us connsider the Stripping stress of concrete as 25 Mpa
and average temp is 6 deg.

Now,

Maturity = Submission (time x temp)
= 15 x 24 x [6 - (11)]
= 6120 deg CH

Plowman's Constant given as A = 21 and B = 61


Se/S 15 = A + B Log10 [ M /1000]

Percentage of strength = 21 + 61 log(6120/1000)
= 68.99

The strength of Concrete at 15 days = 33 x (68.99/100)

= 22.76 Mpa

Since the strength of concrete is less than the stress to
which it is likely to be subjectd while stripping the
formwork, the concrete may fail. Therefore, the formwork
cannot be removed at 15 days time.

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

calculate the quantity of cement ,sand,bars and aggregate used for 28*4 ft with 4 inch (125mm) thick

1805


what should be the PCC ratio to construct a plinth of (40x40x4)ft...??also its estimated cost??

3106


Give me an example of a time when something you tried to accomplish and failed.

3048


how we calculate the vol.of wet concrete..?

1899


estimate quanitity of bricks(19x9x9cm without mortar), cement & sand in 10feet X 10feet wall ?

1894


Define What is made from large rocks, which protects the base of cliffs?

1090


what is the use of beam end forces while using a staad ? wha they are show

2980


What are the alternate material for steel, Sand and aggregate

2386


how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you

2079


What is the exception critarea of cube?

2537


How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance

2982


in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?

2318


what is work of planning deptt. in any construction compny (in road project)

2462


what is the price of a cubic meter of concrete on international market?

1226


While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?

1596