Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how will protect transformer agint overcurrent protection

Answer Posted / manish mishra

i agree with silpa..relay is used only for sensing but the
interruption is performed by circuit breaker...so by using
OC breaker we can protect the transformer from the OC...

Is This Answer Correct ?    2 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

HOW TO DESIGN THE body EARTH cable(Copper Conductor) size for 60KVA UPS?

2005


we have two motors 1250kW,6.6kV to be coupled on the same shaft ,so please provide assistance for their synchronisation.

2068


when will be the iocl interview results ifaced the interview on september 8 th

2204


i have attended the interview on 4th June,08 at Kolkata in IOCL, can anybody tell me what is its result

1986


The advantages of Magnetic flux leakage technique over Ultrasonic technique for non distructive testing of material.

1993


why transmission is only 3 phase and not 2 or 4 or poly phases

2155


What will happen if the d.c. Machine is operated below rated speed?

1249


When a square wave is applied to primary of a transformer then what will be output wave form of secondary ?

2094


On 400 amp factory load how kvarh capacitors provide

1715


what is the common earth

1098


why do we not use equivalent voltage source in negative sequence equivalent ckt.

2060


A generating system will have a total capacity of 300 MW. Find the probable forced outage when the capacity is supplied by two 150 MW units. The operating probability of all units is P=0.98 and forced outage probability rate Q =0.02 .

2647


Which test will be more severe for VCB?

2666


What are the operation carried out in thermal power station?

1065


What is inrush current? how can calculateit? what is the affect of it?

2074