How do you estimate the effort for your project? Where is
the estimation procedure documented?

Answer Posted / megha

WBS is usud for Scheduling/Tracking purpose (in my opninion)

Estimation techniques

1. COCOMO
2. FP (Function Point)
3. KLOC (K Lines of code)
4. SMC (Small /med/complex)
5. Delphi whitebabd
6. Usecase point
6. Prior exp

Documentation we can do it excelsheet

Is This Answer Correct ?    7 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Tell about yourself and job ?

2079


Write a function that inserts an integer into a linked list in ascending order. Write the test cases for this function.

5120


Did you used crystal reports? Do you have sufficient knowledge on crystal reports?

2152


How did you choose the appropriate lifecycle for your project?

2880


Given a MAKEFILE (yeah a makefile), design the data structure that a parser would create and then write code that iterates over that data structure executing commands if needed.

5158






How do you rate yourself in c#,vb.net,Asp.net,oracle,sql server ?

4962


how to tell project details in interview the project is funds flow analysis?

1164


How would you deal with a bug that no one wants to fix? Both the SDE and his lead have said they won?t fix it?

2868


Please, i am a final year student in nigeria and i have a project on pension fund administration and i need help in starting.

1870


Assignment A software house got a project to automate sales/purchase department of a furniture store. The store management is clearly transferred their requirements to the software house management. There is no chance of changing the requirements afterwards. Software house management use waterfall process model to make the project. Given is the progress flow of water-fall process model In waterfall process model, the deliverable (document) produced in one phase serves as an input to the next phase. Suppose you are a project manager who is leading this project. It is decided to work and complete the project using waterfall process model approach. You are required to develop a plan in which the key task is to decide the deliverable that should be built during and after completion of each phase. Also give a description or required contents that must be included in those deliverables. You are not supposed to make the complete project. All you are required to do is to make a Project plan. In that, you need to give a set of deliverables (documents) which according to you, should be developed in each of the phase (Requirements, Designing, implementation, Testing, Maintenance). Also provide contents which should be there in each deliverable. The contents should be clear and have brief explanation. Note:: There are one folder and one file in the attached folder. The file is named as Assignment 4 write-up which is your assignment write-up. The other folder named Project deliverables is the folder in which you are required to organize and place your deliverables. Name of the document/deliverable saved in each folder should be mentioned in the file named checklist (This file is placed in the “Project deliverables” folder) For Example If you produce a deliverable named Requirement Specification (RS) in the “Requirements” phase. You need to do following tasks 1) Finalize the RS contents 2) Save the file in sub-folder named Requirements 3) Write the name of this document in the checklist file under the heading Requirements. Similarly, you need to make and save deliverables of each phase. Not all phases contain one deliverable. There must be some phases having more than one deliverables. PLEASE SIR PRIVIDE ME THE CHECK LIST FOR GIVE SENERION ? CHECKLIST ARE: 1-Requirements 2- Designing 3- Implementation 4- Testing 5- Maintenance

6470


Explain dll hell?

655


Tell about current project ?

2205


Write the test cases for instr function?

635


Why do you want to work for Microsoft?

2701


When you come in to the office, how do you know what you have to do during the day?

1925