Answer Posted / chowdary
Sorry Syam and Thanx for ur answer, Syam.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Hi Viewers can any body explain me how to update and ahange the already existed data in physical file using subfile ? please explain me with the code if possible?
What is the purpose of record level identifier?
write an RPG program to calculate the marks of 5 students (A,B, C, D, E)in 3 different subjects (eng, math, sci) an display on the screen
how do you use commitment control in rpg?
which program rpg or cl is efficent to update a transaction onto a database file and why ?
What is difference between bind by copy and bind by reference?
What is file identifier where we can use?
Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.
Interviewer asked me write down DDS for load all subfile .can anybody write dds
Q:HI friends accually ihave one problem plesase let me know the alternate code of this code. Related field description of code: Add a field, CALvsPRD, "Calendar Day Starts Before/After Production Day" to the parameter set WRKORDER which accepts values 'A' or 'B' o B = Calendar Day Starts Before Production Day o A = Calendar Day Starts After Production Day o Any other value indicates the production and calendar dates are always the same. code: Automatic Execution Of *INZSR Subroutine /Z01 * retrieves WRKORDER field values. /Z01 * Calculate default Production Date and return it to caller. /Z01 * Production date defaults to system date /Z01 C Eval P@Pdate = %DATE() /Z01 * unless Calendar date starts Before PDN(production) date and /Z01 * system time is before PDN Start Time then /Z01 * PDN date is yesterday. /Z01 C If W@CALvsPRD = 'B' and /Z01 C %TIME() < %TIME (W@Strtime) /Z01 C Eval P@Pdate -= %Day(1) /Z01 * unless Calendar date starts After PDN date and /Z01 * system time is *GE PDN(production) Start Time then /Z01 * PDN date is tomorrow. /Z01 C ElseIf W@CALvsPRD = 'A' and W@Strtime > *Zero and /Z01 C %TIME() >= %TIME (W@STrtime) /Z01 C Eval P@Pdate += %Day(1) /Z01 C EndIf /Z01 C Eval *InLr = *On
what is program status data structure?
what is the procedure and explain about real time scenario.
Explain mdt?
what do you mean by an input subfile, what are the keywords required?
What is the difference between iter and do?