I'm puting roof slab M20 Design Concrete,Twoway slab how
many days wait for remooving of shuttering?

Answer Posted / veeramani amanthan

what will be the concrete strength attained in 7, 14, & 28
days please clear

Is This Answer Correct ?    2 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

1. What is coefficient use for calculation of shuttering. 2. What is coefficient use for calculation of reinforcement in one cum of concrete.

7572


what is shuttering co efficient?

1301


WHAT IS THE MAIN DIFFERENCE B/W HIGHWAYS AND MOTERWAYS?

1936


TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING

2100


what is education Cess.

1740






what is E VALUE FOR WOOD

1524


What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.

1559


how many mason and labaur work for a 1 brass bricks plz let me know the calculate & how to made calculation for this and whats the formulas for this?

5732


How do you measure concrete?

768


Why you are leaving present job?

1603


which software is better for design and analysis of buildings (stadd pro ) or (Etabs)

1836


what is the use in canals of longitudinal drains and cross drains in lining areas?

1376


How can I make justification between using concrete grade c35 compare c37?

1096


what is diffrence between catchment area,watershed and basin?

2498


If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?

1712