I'm puting roof slab M20 Design Concrete,Twoway slab how
many days wait for remooving of shuttering?

Answer Posted / veeramani amanthan

hi friends thank you your reply to me but now confushing
wich one i take 14 days or 28days please conform

Is This Answer Correct ?    2 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

List out some of the checking’s, done at the completion of construction?

714


How many kilo-newtons equals 1000 kilogram?

668


What is progress payment?

714


What is rate of concrete surface rendering work per sqm

1442


what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)

1525






what is the function of GSB all class ?

685


I Want To Know Quantity of Cement Conc. & Sand in Column of 9"x9"x10'

2052


How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????

1545


can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now

1673


PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.

2006


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting?

1867


How to increase a bearing capacity of soil?

659


Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.

1779


For making a new road in a village having a school & hospital , tell the steps of construction systemically ?

1167


what is the sequence of the activities in the typical under ground water tank including civil & MEP works.

1964