I'm puting roof slab M20 Design Concrete,Twoway slab how
many days wait for remooving of shuttering?

Answer Posted / vinod

as per curing period will b 7days r 28 days the same can be
used for de shuttering

Is This Answer Correct ?    4 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Which are the top apps for you civil engineer?

727


Floor to floor high of domestic building is 3m design a quarter turn staircase starting assume taken give a suitable diagram of it?

1402


Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.

1922


from where ican get sample papers for CET-delhi 2012

2044


how do i remedy a foundatiom that the column bases was cast and aftet 28days crushing the conprehensive strength of the concrete fall below the specification 25N/mm2

1451






How to calculate the cement plastering for circular and rectangular water storage tanks and how to calculate the area of circular and rectangular floor?? Please help me

1464


Define graphics window?

712


how many mason and labaur work for a 1 brass bricks plz let me know the calculate & how to made calculation for this and whats the formulas for this?

5735


length where bent up is made in slab of bridge from one end

1452


Why should you show Client/Engineer activities clearly on the project plan?

1961


Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa

1760


How to calculate quanty of steel in four leg stirrups?

1460


What are the materials used in building a gravity dam?

647


What is a projection line?

715


how much of the strength comes from post-production curing

2272