I'm puting roof slab M20 Design Concrete,Twoway slab how
many days wait for remooving of shuttering?
Answer Posted / k chiranjeevulu
to remove shuttering after 14 days
| Is This Answer Correct ? | 32 Yes | 6 No |
Post New Answer View All Answers
What is the substitute of Mastic Asphalt?
What is packing Factor ?
all technical question
How do you compute volume of airflow?
Why steel rods are produced only in even dimensions?
Define What is a kip?
Explain the different types of roofing systems?
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?
Bearing capacity of soil determined as per ASTM is to design the foundation size.what is the importance of EV1/EV2 value as per DIN .My consultant ask me to test the the soil as per din to find out this ratio to assess the compacted strength of soil ,,?? is it meaning full ??
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
HOE TO YOU PLAN TO ACCHIEVE THE GOALS?
Define unit atmospheric pressure? Difference between gauge pressure, absolute pressure?
what is your role of in previous company as a construction manager
i have to give lap joint fo 1Mtr steel of dia12mm,whenever i did mistake i cut less 5cm plz tell me how much i will give lap joint so that length comes 1Mtr