1)What will you do if main incomer VCB fail in your site ?
Answer Posted / g.kumaresan.
If Main incomer fail in our site Immediatly to Isolate the
incomming supply and VCB. Bec's to protect the inside Heavy
Equipment insite in our site, then to inform the situation
in our Authoriy officer, at the same time to ensure the
back feeding arrangement, Bec's can not maintain the supply
intruption in long time.
So, doing back feeding arrangement immediatly with our
higher authrity knowledge and also other officer sugection.
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
What is electrical cable termination
In ACS 1000 drive we are using 12 pulse converter,why don't use 3 pulse converter.
what is meant by k-rating in isolation transformer?what is k9, k14 stands for?
what is circuit recombiner and how it is different from circuit breaker
How to dimensioning SDCCH, LAPD and CS7 signaling on GSM?
If we need4× 50mm sq cable but it's not available so we can pull 4×25mm sq 2cables
What is the formula for selecting the cabels according to load? How to calculate what sq.mm cabel to be used?
Could you measure voltage in series?
Dear all, I'm manikandan I have done by DIPLOMA EEE from 2011 , I have 5 years of experience from Power plant instrumentation field , which one field is give long life & which one field is best ,I confused a lot and also I'm studying AMIE, can I choose which department from Section B examination? pls tell me
specific difference of ICT&Auto Transformer
How to perform a DC resistance test In Alternator and their proceduces?
How can we findout the maximum efficiancy of Transformer? At which load?
How we can determine short circuiting current any plant and for example a plant which power generation is 415 volts and plant load is 500 kw.
mccb service sittings be done?
explain the function of brush less dc motor?