1)What will you do if main incomer VCB fail in your site ?

Answer Posted / kanand078

if DG is there run the pland at dg load..after i will check
the fault and rectify

Is This Answer Correct ?    2 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Anybody know how schematic diagram for reverse power relay? RPR for generator protection

1667


how is control wiring coding is done in a CRP panel ?

1542


Why we are use dol starter up to 10 hp

943


What are the disadvantages of thermal power plant?

649


how ceiling fan worked?

1494






what is the principle of the single phase energy meter? and,what is the advantages and disadvantages of single phase energy meter?

3960


how can we say that stator magnetic field rotates with synchronous speed?can we derive?

1308


State nyquist stability criterion.

644


how we can come to know that motor winding resistance which showing by DMM is right or wrong???is there any chart or something that we will compare & check???

1426


What can you contribute to the progress of our Company as an employee if you are selected?

4884


What is Delta Connection? What is meant by Forward Delta & Reverse Delta & How Will be the Connection in Power Transformers?

1815


What is the importance of counter based plan & how is it scheduled?

1562


plz send me Bhel, Mahagenco, sbi previous exam paper for electrical engineer on my email-id kambali_smita@yahoo.co.in

1936


if an insulated power and control cables of a running gas diesel gensets laid direct in an open trench i.e, trench bed is not rcc of a power house in which rain water, spillage water alwas exists and all power control cables remains submerged even when gas gensets of 480 kw each runningin on load. These power &control cables runs from power house to switchgear room through these trenches in which water remains most of the time. pl explain its merit & de-merit

1408


working principle of AC Servo Motor with its construction

8342