1)What will you do if main incomer VCB fail in your site ?
Answer Posted / kanand078
if DG is there run the pland at dg load..after i will check
the fault and rectify
Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
Anybody know how schematic diagram for reverse power relay? RPR for generator protection
how is control wiring coding is done in a CRP panel ?
Why we are use dol starter up to 10 hp
What are the disadvantages of thermal power plant?
how ceiling fan worked?
what is the principle of the single phase energy meter? and,what is the advantages and disadvantages of single phase energy meter?
how can we say that stator magnetic field rotates with synchronous speed?can we derive?
State nyquist stability criterion.
how we can come to know that motor winding resistance which showing by DMM is right or wrong???is there any chart or something that we will compare & check???
What can you contribute to the progress of our Company as an employee if you are selected?
What is Delta Connection? What is meant by Forward Delta & Reverse Delta & How Will be the Connection in Power Transformers?
What is the importance of counter based plan & how is it scheduled?
plz send me Bhel, Mahagenco, sbi previous exam paper for electrical engineer on my email-id kambali_smita@yahoo.co.in
if an insulated power and control cables of a running gas diesel gensets laid direct in an open trench i.e, trench bed is not rcc of a power house in which rain water, spillage water alwas exists and all power control cables remains submerged even when gas gensets of 480 kw each runningin on load. These power &control cables runs from power house to switchgear room through these trenches in which water remains most of the time. pl explain its merit & de-merit
working principle of AC Servo Motor with its construction