what is the full form of bpl

Answer Posted / amrish

below poverty line

Is This Answer Correct ?    75 Yes 20 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

There is a rectangular terrace whose length and width are 60m X 20m. There is a walkway of uniform width around terrace. Area of walkway is 516m^2. Find width of walkway:

804


A contractor employed 200 men to complete a strip of highway in 200 days. After 150 days he found that only 3/5th of the strip is complete. How many additional men should be employed to complete the work on time?

1121


A man buys 12 lts of liquid which contains 20% of the liquid and the rest is water. He then mixes it with 10 lts of another mixture with 30% of liquid.What is the % of water in the new mixture?

901


Ms. Anurag Awasthi deposits an amount of Rs. 56500 to obtain a simple interest at the rats of 12% p.a. for 3 years. What total amount will Mr. Anurag Awasthi get at the end of 3 year?

1095


2 is what % of 4t ?

765






in a school for a student out of a 100 he got 74 of average for 7 subjects and he got 79 marks in 8th subject. What is the average of all the subjects?

760


If 1/4 of the time from midnight plus 1/2 of the time from now to midnight is the present time,then what is the present time ?

883


What number should be added to or subtracted from each term of the ratio 17 : 24 so that it becomes equal 1 : 2.

859


What is the angle between the two hands of the clock when it shows 10:10?

705


What is the missing number in this series? 8 2 14 6 11 ? 14 6 18 12

710


the probability of getting at least in a single through of three coins is

681


in a company 30% are supervisors and 40% employees are male if 60% of supervisors are male. what is the probability that a randomly choosen employee is a male or female?

948


During a given week A programmer spends 1/4 of his time preparing flow chart, 3/8 of his time coding and the rest of the time in debugging the programs. If he works 48 hours during the week , how many hours did he spend debugging the program.

806


A and b can do a piece of work in 15 and 10 days. A and b work on it for sometime and then a leaves b completes the job in 5 days. For how long did a work.

798


A pipe can fill a tank in 30 min B can fill in 28 min then if 3/4 th of tank can be filled by B pipe and after wards bothare opened then how much time is required by both the pipes to fill the tank completely. note: the values of A and B may slitely vary be ware.

795