When i went to a interview the interviewer ask me a
question for that i cant able to answer him if anyone knows
answer me
How will you design a capacitor bank for a plant? if my p.f
is 0.6 i have to improve it to 0.9 or 1 what kind of steps i
have to do? and is there any formula for calculating this?
Answer Posted / raju
to improve powerfactor only capacitor banks should be used
but not inductor as capacitor having leading pf which wil
reduces reactive power and improves pf
Is This Answer Correct ? | 3 Yes | 3 No |
Post New Answer View All Answers
how to calculate the size of the HT cable
Connection diagram for KW meter and Kva meter
we need a ntpc previous papers
Why cables and busbar both needed in LT Panels?
percetans
what is the calculation involved to design the heater to heat 10KL of water in temperature control unit?
why use phase displacement in transformer.and effect of phase displacement on transformer
Whether 3 phase induction motorwith 100 hp capacity , Amp 160 for which sensitive earth fault relay , type CTUM 15 can be used?
What do you understand by avr?
high voltage transformer input voltage,current and amps rating..distributed transformer input voltage,current and amps rating...
L.A. (Lightening Arrester) is located at a place from where transmission line enters the transmitting substation. So L.A. (Lightening Arrester) is the first equipments which has to encounter with lightening, high voltage surges and switching surges. It has to absorb energy of lightening, high voltage surges, and switching surges. L.A. (Lightening Arrester) is made up of layers of semiconductors. If these layers can not tolerate energy released by lightening, high voltage surges, and switching surges the L.A. (Lightening Arrester) blasts.
Why dry type cast resin transformers tap link blast in HV side while power shut down times on load?
what is your aim
What is the effect on power factor, shown by a trivector meter; incase of reverse phase sequence. If the power factor of a system is lag what meter will show in case of reverse phase sequence connected to the meter. and What in case of lead.
0.5,1,1.5,2.5,4.0.6.0,10,16 square mm electrical wires how much take maximum current in 50htz