what is mean by marshalling box in transformer?
Answer Posted / varun
Marshalling box is complete with
a) 240 V, 15A, SPN socket outlet, complete with switch and
HRC fuse for hand lamp
connection.
b) Cubicle lamp (CFL) complete in all respects (with lamp
holder, switch, HRC fuses)
but without lamp.
c) All auxiliary contactors as required in the order to
make necessary potential free
contacts for remote alarm and tripping.
d) Marshalling box shall be weather proof type and shall be
provided on the front side
of transformer tank and not on radiator.
6.2 Marshalling box shall be provided with terminals for
oil temperature indicator, winding
temperature indicator, magnetic oil gauge and buchholz
relay and other control terminals as
applicable.
Is This Answer Correct ? | 11 Yes | 15 No |
Post New Answer View All Answers
how will calculate the safe starting current of 3-phase squirrel cage induction motor?
HOW DO I CALCULATE THE SETTINGS FOR THE DIFFERENTIAL PROTECTION OF A 12kV/6.6kV, 6MVA,DYN11 XMER WITH PRIMARY SIDE CTR 400/1 AND SEC SIDE CTR 600/1?
How much weight an electrical engine can pull??
What is the effect of pi controller on the system performance?
How to size fuse? How to size MCB?
before synchronizing an alternator,power factor is leading ,why?
i need mat lab program to find out the transmission line losses,regulation and losses
can any tell me why slope 40% and 80% is calculated in differential protection?
how we provide neutral earth on synchronising panel as per electrical standards?
1.Z transform always lies around ? a) origin b) pole c) zero d) z=1. Multiples Mcqs which is bother me can’t find answers on internet. Some help required with little explanation . Note: this is not homework or related to any test. Thanks
Why we are using only Dyn11 tranformer in distribution system but not using a Dyn1 in distributing system?why not and advantage and disadvantage in both
Purpose of providing neutral isolation panel for parallel operation of diesel generator
dc supply given to dc generator winding.how is possible? my knowledge is saying the winding will burn. please reply.
What are the site acceptance tests for power cables, DG Sets, LT panels & 30kVA UPS ?
Why is remote backup preferred to local backup?