how do we calculate quantity of cement , sand and
aggregates in 1 m3 of M30 grade concrete ?
Answer Posted / sachdeva d.p
M30- cement=1/4*1.54=0.385*28.8=11bags
sand-0.385*1=0.385cum
agregate 0.385*2=0.77cum
Notes;why we multiply by 1.54
dry dencity=1.54*wet denciti in conct.work
Is This Answer Correct ? | 246 Yes | 93 No |
Post New Answer View All Answers
Define What is aggregate?
How to calculate woden area in sft and Cft
Slump Values for works?
How to calculate steel for beam slab and column
what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal
How to check slab shuttering level.? Or check list for slab ?
How can i do RCC rate analysis?
What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?
how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
pile load testing procedure
how to take concrete quantity for precast segment for viaduct project?
a sewer which receives the discharge of no. of house sewer is called house sewer lateral sewer intrcepting sewer sub-main sewer
find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.
what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)