Which are the master data relevant for PP module?
Answer Posted / jvk
Material Master
BOM
Workcenter
Routing
Is This Answer Correct ? | 21 Yes | 3 No |
Post New Answer View All Answers
What is primary cost and secondary cost?
• How are basic order dates determined?
Explain what is plm (product lifecycle management) in sap pp and what is the use?
In implementation stage tell some standard scenario before AS-Is & TO-BE
What is SOP and types of SOP?
What are all the steps involved in Variant Configuration?
What is mrp list and what is the use of it?
Difference between MD01, MD02 and MD03.
Difference between Manual reorder point and Automatic reorder point.
What is a ‘bom’?
How system calculate the actual cost?
Can any body explain me why work scheduling view is required for semi finished and finished products?
You want to insert an inspection check point at the end of an operation. How would you do that?
Difference between different strategy groups.
Is it possible to convert a 'multiple bom' into a 'variant bom'?