Answer Posted / kiran patil
It is based on below :-
1) Type of industry
2) Who is taking interview ( Person work experience )
3) what type of requirement i.e. report plant required
through SAP PM
Question :- ( Any question can ask of below relating to PM
config)& other relating to above point
Create Structure for functional Location
Define functional Location category
Define Equipment category
Define Number range for Equipment
Define User status to equipment
Define Measuring point category
Define Permit Category
PM Master Data
Set BOM modification parameter
Define BOM status
Define BOM usage
Define Spare parts indicator
Define User specific settings
Define work center parameter
Define standard value key
Define responsible person for work center
Define control keys for task list
Define task list usage
Define user defined fields
Define PRT control key
Define Serial number profile
Define serialization attributes for movement types
Maintenance Plan and Notification
Define maintenance Planner group
Define Maintenance plan category
Define number range for maintenance plan
Define Maintenance Notification Type
Define screen template for Notification type.
Define field selection for notification type
Assign Notification type to PM order type
Define priorities
Over view of notification type
Plant Maintenance Order
Define order type
Configure number range for order type
Assign order type to maintenance plans
Define default values for planning indicator
Define priorities for order type
Define field selection for order type
Define control key
Define Maintenance Activity Type
Assign PM activity type to order type
Define documentation for Goods Movements
Define checking rule
Define Status profile
Define scheduling type for PM order
Define Attributes for system message
Equipment Calibration
Define QM Plant settings
Define inspection type
Define default values for inspection types
Assign inspection type to order type and many more
Is This Answer Correct ? | 16 Yes | 1 No |
Post New Answer View All Answers
What is shift factor? Explain with example.
What do you understand by object related structuring of technical objects?
How would you attach a drawing to the equipment master data?
What is the process for maintaining catalog a profile for each equipment?
What is the master data in sap pm?
What is the maintenance plan? Different type of maintenance plans?
What are difference type of planning are used in sap pm module?
How can a user find "commit work" statement in the pm orders (t-code iw32)?
What is maintenance planning? What are different types of maintenance planning?
Differentiate between equipment master and material master. On what basis do we decide which one should we create?
You want to make zip code field mandatory in a maintenance order. How would you do that? List the steps you will take.
What do the mb31 tcodes in sap- pm mean?
Explain use of each control key with example.
Is it possible to change the structure indicator of functional location?
What is service entry sheet? Why it is important for plant maintenance module?