Hi friends,
I am using a load all subfile , and currently i am in in
the third page of the subfile , from third page i have
selected a record and called some other program .on
returning, subfile is being loaded from the frist page. so
can any one kindly suggest me in retaining my third page
after returning. i.e loading from third page.
Answer Posted / mithun paul
Before call the program store the rrn and after retuning
from the program move that rrn number to variable of
SFLRCDNBR and write the subfile. It shows the subfile in
that particular page not the first page.
Mithun Paul
KMG Infotech, Kolkata
Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
Explain mdt?
what is the use of sflnxtchg?
what is file information data structure?
When we have a file with Duplicate records and I want to read the unique record from the file. For example a file containing Emp Name as 'Ram' and there are 3 entries of it. So how to read a unique record from File?
How to call one program from another program in RPG? please help me with the code
what is the necessary keyword needed to scroll subfile records?
Assume 2 users are using the same file and first user updates some record in the file. Will the 2nd user will be able to see the updated record or not?
Please tell me how to read the records from a file with load an array of size with error conditions(The logic answer for this question is ARR is array of 99 elements Z-ADD 0 IDX *LOVAL SETLL FILE READ FILE 99 *IN99 DOWEQ *OFF IDX ANDLT 99 ADD 1 IDX MOVE FIELD ARR,IDX READ FILE 99 ENDDO).So,Please give me the complete of this code.
how does the rpg element work?
Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.
How Chain operation copies the record's data to the input buffer for the program?
what is the difference between do while and do until?
Hi Viewers can any body explain me how to update and ahange the already existed data in physical file using subfile ? please explain me with the code if possible?
what is the rpg system?
How to declare the pull button in AS/400..