wat is syncronization . wat parameter will take for
syncronization.

Answer Posted / sudheer

when one Generator is running and suppose its rating is
1500 kva/1200 kw,and load increased and we wants to put
more load on GENERATOR . So then we have to run second
generator and to be shift some load on second generator,
otherwise the generator will be over loaded and tripped on
over-load fault. when we connect two generators parrallel,
this arrangement is called synchronisation.we connect the
out-put supply of both generators parallel by
synchronisation.In synchronisation we have to match these
parameters--phase sequence, frequency and voltage.when all
three parameters match we ON the breaker and
synchronisation complete and now we can put more load
(about 2000 kw) on generator.

Is This Answer Correct ?    17 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How you will determine the volume of oil in a particular Distribution transformer.

1447


List the advantages of star-delta starter with induction motor?

619


what is the profesional board for electrical engineer what is thepast and during construction for electrical engineering

1470


Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.

1574


11kv/433v delta/star distribution transformer primary side full load Ht current is 83.33A in , but input side VCB rating 800A.why?

1214






According to underground cables a) stress b/w sheath & conductor is high b) inrush of core & conductor

1522


i have seen one 8.4 MW synchronous motor in a plant located in bellary it is fixed with brushless rotary rectifier ,anybody can explain its start up principle

1513


How Can I calculate for the photometrics requirements for a street lighting? Data given are: 45 units of 6 meter light pole with 150 watts metal halide lamp, 220 volts and installed in a promenade area.

1426


How to set the relay,,??

1634


what is meant by 3rd hormonics ?

1408


what is the safety of voltage power transformer(2250KVA0

1555


Brief me about maintenance planning & sheduling of machine tool.

1715


a starter used for squirrel cage induction motor?

1217


High speed earth switch operation with diagram

1900


WHAT IS THE FORMULA FOR CALCULATING CURRENT RATING(DIRECT IN GROUND OR AIR) OF ARMOURED(XLPE) CABLE OF 4C,16Sqmm?

1660