The PGMA calls PGMB.PGMB generates a report.The report
should contain the called program name(PGMA).How do i get
the called program name in PGMB to print it on the spool
file?(calling program name should NOT be hard coded or
passed as parameter to called program?

Answer Posted / ld123q44

Use a data area. Just before calling Pgm B stick Pgm A name
in the data area. Then when you are in Pgm B examine that
data area and get the value loaded in Pgm A.

Is This Answer Correct ?    3 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Program to read marks of 10 students for 4 subjects and compute and display total marks and status of each student in rpg

714


how do you use commitment control in rpg?

757


Suppose we have one database file and it is used by 5 programs and in 3 program we have to add some records in datbase file s what is the impact on other program?

1455


How to declare the pull button in AS/400..

1878


How to write record if no field or the field are different in physical file in rpgle ?

490






Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.

1761


What is file identifier where we can use?

650


What is a record lock error?

1265


what is the rpg system?

665


how do I declare a table or array in rpg iv?

737


what was the robotech rpg?

684


what is program status data structure?

1387


What is difference between bind by copy and bind by reference?

1729


what is an online rpg?

725


What is the diff bw PF/LF Name and their Record format name? what is restriction in record format then file name?

2519