Some times While checking MSGW for object / member /
record locks ,I have seen it's locked by itself ...? How
it happen and what action we need to perform if job is
updating / writing a record....?

Answer Posted / duvara (duvara.cse@gmail.com)

when the file is opened in update mode, when u chain the
same record two time continuously with out any updation bw
2 chains then u can face this problem. because the record
is locked by the first chain operation, so cannot chain the
same record again.

To relese the record simply update that record befor the
next chain/read.

Is This Answer Correct ?    6 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

When it is desirable to describe files Internally?

1196


How to write record if no field or the field are different in physical file in rpgle ?

494


what is the necessary keyword needed to scroll subfile records?

707


What is difference between bind by copy and bind by reference?

1736


thanks mr.Harshad R Suryawaunshi,i'm new to as400 i think you are telling in rpgile i know only rpg400 if possible can you tell in rpg400

1899






how do I declare a table or array in rpg iv?

741


Assume 2 users are using the same file and first user updates some record in the file. Will the 2nd user will be able to see the updated record or not?

521


how do you use commitment control in rpg?

761


is this a rpg channel?

684


how does the rpg element work?

722


what is file information data structure?

1380


how can you display specific subfile page on the screen in unequal subfile?

677


Q:HI friends accually ihave one problem plesase let me know the alternate code of this code. Related field description of code: Add a field, CALvsPRD, "Calendar Day Starts Before/After Production Day" to the parameter set WRKORDER which accepts values 'A' or 'B' o B = Calendar Day Starts Before Production Day o A = Calendar Day Starts After Production Day o Any other value indicates the production and calendar dates are always the same. code: Automatic Execution Of *INZSR Subroutine /Z01 * retrieves WRKORDER field values. /Z01 * Calculate default Production Date and return it to caller. /Z01 * Production date defaults to system date /Z01 C Eval P@Pdate = %DATE() /Z01 * unless Calendar date starts Before PDN(production) date and /Z01 * system time is before PDN Start Time then /Z01 * PDN date is yesterday. /Z01 C If W@CALvsPRD = 'B' and /Z01 C %TIME() < %TIME (W@Strtime) /Z01 C Eval P@Pdate -= %Day(1) /Z01 * unless Calendar date starts After PDN date and /Z01 * system time is *GE PDN(production) Start Time then /Z01 * PDN date is tomorrow. /Z01 C ElseIf W@CALvsPRD = 'A' and W@Strtime > *Zero and /Z01 C %TIME() >= %TIME (W@STrtime) /Z01 C Eval P@Pdate += %Day(1) /Z01 C EndIf /Z01 C Eval *InLr = *On

2016


how do I play {insert rpg system here}?

590


How Chain operation copies the record's data to the input buffer for the program?

1086