A train travels a certain distance taking 7 hrs in forward
journey, during the return journey increased speed 12km/hr
takes the times 5 hrs.What is the distance traveled
Answer Posted / shekhar
210
| Is This Answer Correct ? | 12 Yes | 12 No |
Post New Answer View All Answers
Argentina had football team of 22 player of which captain is from Brazilian team and goalki from European team. For remaining player they have picked 6 from Argentinian and 14 from European. Now for a team of 11 they must have goalki and captain so out of 9 now they plan to select 3 from Argentinian and 6 from European. Find out no. of methods available for it
The day before yesterday was WEDNESDAY then the day after tomorrow is?
if the radius of the circle is increased by 6% then its area increased by
There are 5 red shoes, 4 green shoes. If one draws randomly a shoe what is the probability of getting red shoe is ?
Robert invested rupees 8000 in a fixed deposit scheme for 2 years at compound interest of 5 p.c per annum. Calculate and choose from the below mentioned option, how much amount will Robert get from the fixed deposit on maturity?
A school has 30% students from Maharashtra .Out of these 20% are Bombey students. Find the total percentage of Bombay?
if x=y=2z and xyz =256 then x=
12 men can build wall of length of 12m in 10 days how many men are required to build 20 m in 15 days.
A bus started from bus stand at 8.00a m and after 30 min staying at destination, it returned back to the bus stand. The destination is 27 miles from the bus stand. The speed of the bus 50 percent fast speed. At what time it retur4ns to the bus stand
A tiffin box manufacturer reduces the price of his school kids' tiffin from Rs.30/- to Rs.28/- per tiffin and the price of regular tiffin from Rs.24/- to Rs.23/- per tiffin. A caterer normally spends Rs.1440/- a month for tiffin and 3/4 of this is for regular tiffin. How much will they save a month under the new prices?
Complete the series 1 6 3 7 5 8 7 ?
Choose the odd man out from the below mentioned options?
Instead of multiplying a number by 7, the number is divided by 7. What is the percentage of error obtained?
JSW steel online test questions
ABCE is an isosceles trapezoid and ACDE is a rectangle. AB = 10 and EC = 20. What is the length of AE?