What is the difference between functional spec. and
Business requirement specification?
Answer Posted / paresh d
Functional Requirements:- Functional requirements are
prepared by the system analyst. Its all about the
functionality for the software.
Business Requirement specification:- it is prepared by the
business analysts. It contains the business logic which is
going to execute into the software.
The difference between both the specification is the
functional requirement is techinical document
Is This Answer Correct ? | 7 Yes | 0 No |
Post New Answer View All Answers
why text area checkpoints cannot used for web applications
How many types of trigger events are there in qtp?
How to associate shared object repository to test in qtp?
what are the critical test cases in crm? tell me atleast 5 critical test cases? what are the critical bug u find out while testing crm domain?
what is ODC and GDC?
In keyward driven framework what will be the step for yahoo login page ,inbox logout,plz explain in detail
How you can find the absolute value of the number in qtp?
Can we create a qtp test from qc?
is it possible to add sheets to excel at runtime
Analyzing the checpoint results?
Is QTP supports Unix. If yes, then how the test automation is done?
What is the difference between call to existing action and copy of an action?
HI Everybody, I am using QTP 9.2, I have a problem and hope everybody help me solve it. Now I need to use mouse wheel event to zoom in or zoom out in web client, but QTP can't catch this event. I look forward helping of everybody. Thank you very much.
What the differences are and best practical application of Object Repository?
hi all can any body explain how to write the script for finding the mandatory fields which are having [red Astrik sign (*)]