Answer Posted / manisha dahatonde
Go to tcode we05 or we02 and there u will find status of Idoc.
Red status indicates failure and Green indicates success.
Idoc with status 53 is successfully executed.
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What are the components of netweaver?
Explain about netweaver?
How to change SAP parameter?
Wt is the diff between fix value and value mapping?
How do you decide use of NWBC and SAP GUI logon?
What are the different installation modes for SAP NetWeaver installation?
What is the difference between call transaction and session?
What are the main components of the SAP Netweaver Portal?
What is the use of program id in sender rfc adapter?
In how many ways sap netweaver as can be installed?
Where do you download SAP NetWeaver trial version? What are the installation steps?
What is the reason for lock table overflow?
How to create RFC destination?
What is lock management in sap system? Explain.
How to resolve lock table overflow?