Product Costing Run is over. Now If I add one more
rawmaterial for that material also it has to included & run
the cost. But it is not happening?
Answer Posted / thakur
When we run the cost estimate, it updates the standard cost
of that finished material. If you want to update the
standard cost of the material including new raw material,
obveously you need to delete and re-run the cost estimate.
Otherwise, when you create the production order, there in
that cost calculation, real cost will be captured including
new RM and used for that production order and hence costing
data will be available for reporting and other purposes.
But standard cost will be effected only in the next costing
run, which may be falling in next month.
Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
Mention what is the use of t-code cs20 in bom?
Explain transaction code KO88 or CO88.
what are the settings needed for variant configuration?
what is std info set? where it is used?
How do you restrict the data to be entered in the payroll area?
What are the parameters are there in Order type or in dependent para. config?
Explain Kanban.
What is the use of stock requirement list?
What is collective order. Pre requisite of the collective order?
What is "work center" in sap pp and what is the use of data in work centers?
Why is work scheduling required for semi finished and finished products?
What is Material status and which view of the material master it is available?
What is the difference between the fixing type 1, 2, 3, 4?
Explain what is the use of sap material view and list out other parameters where sap material view is applicable?
What is processing class, where we do them and why?