What is QA Life cycle

Answer Posted / sreedhar

QA Life Cycle is nothing but the SDLC models and the
requriments of the client,Design,Testing and production of
the product with respective to cost is the Life cycle of QA.

Is This Answer Correct ?    13 Yes 13 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

On what basis CCB approves the changes?

1634


Hi Friends, I have 2.5 yrs of experience. i am havung interview for QA/QC position tomorrow.what type of questions shall i expect for this experience? PLS HELP. THANKS IN ADVANCE

1582


iq test

1369


According to you, when is the good time to start qa in a project?

578


What is boundary testing?

649






What are the tools used by a tester while testing?

628


Why is it often hard for management to get serious about quality assurance?

558


What is Operational testing?

1779


What are the types of documents in sqa?

619


Explain the process of qa testing?

629


Why we do load and performance testing?

752


What is the difference between quality assurance (qa) and quality control (qc)?

623


What is automated software quality (asq)?

658


Case Study:-Given a standard calculator with the basic functionality of addition,substration,multiplication and division-write the test case to test this and tell how did it take to write the above test case and how ling would it take to execute them?

1664


How frequently is your project audited? How do you know the result of these audits?

1763