When should testing be stopped?

Answer Posted / psrisusee

It is not very difficult to know "When to Stop Testing?"

In the Test Plan there is somthing called Exit Criteria,
Where the Product release status has been defined
clearly.I.e. when to stop testing.

- If defect dencity level is predictable low.
- Test Schedule has been reached.
- If Build meets the requirment.

Is This Answer Correct ?    4 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is Registry?

1659


What do you do (with the project tasks) when the schedule fails?

2580


What is the Jar file?

1623


what is entry and exit criteria and explain it?

1028


Should testing be done only after the build and execution phases are complete?

1085






What are the challenges you faced in your project (Testing) and in your company?

2600


What’s the difference between a bug and a defect?

675


Hi all, can anyone tell me what is the selection procedure in Birlasoft for Manual Tester?It will be a great help.

1466


How many types of api testing are there?

652


What makes a good software qa engineer?

652


How can write testcases on a code under development pls give asnwer

1540


Hi, this is not a tech question, i have 4 yrs of experience in Mainframe systems, presently as a mainframe tester in pune, i just want to step towards south locatios(preferable hyd), suggest me the best way to get calls from hyd.

1653


what does 80hz refresh rate indicates?

2370


If we have no srs, brs but we have test cases does you execute the test cases blindly or do you follow any other process?

756


What are the standard you follow in your company to prepare test plan document? Content is same in every standard or not. Also is there any document to read about the testing standards? Thanks in advance for giving me the answer.

1555