how can i integrate ecc6.0sr3 with bi7 or netweaver 7 into
single sap system.? pls give me some step. i know
installation.
Answer Posted / chandra b
If you want to integrate between BI to R/3, follow the belo
steps
1.Create logical client for both systems
2.Install BI Content in BI System
3.Maintain BW Support packs levels in both systems
4.Replicate the server Using RSA1 tcode in BI System
Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
Explain reference and service user in sap. What are their uses?
i want my company code and controlling area defaut as 'ABC" through out SAP what to do ? and my plantcode also default to some value
Have you done any up gradations?
What are the pre requisite for the SAP Installation?
How to delet a table in sap. How to move a table from one location to another.
What is Unit Testing in SAP?
Explain kernel upgrade?
How to transport objects from Production to Development?
What is your organization’s security philosophy? What level of security does your data require? How much risk are you willing to assume in each application area?
What is the purpose of webdisptcher and Installing and configuring Web Dispatcher what are the prerequisites?
Which transaction do you use to check buffer statistics ?
Do you have done System copy? What are the steps?
What is the difference between kernel replacement and support package?
What is the use of Trusted system? I know that there is no need of UID and PWD to communicate with partner system. In what situation it is good to go for Trusted system?
What are the errors you got while applying support pack?