IN V-Model, from where a tester involves and from where a
developer will involve???
Answer Posted / sm
In v-model the tester starts after getting the SRS document
from the TL in the same manner developers work will start
from software design after receiving the SRS document
Later the main "system testing" will start only after
getting the software build from the developers
So system testing starts only after receiving the build from
the developers till that they will prepare the required
documents like test strategy,Test cases,Later Conducting
system testing,Preparing Test log document.
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
How can I do Server side Interface testing in Web Testing?
what is the testing approach for windows Explorer(Not IE Explorer)
What are the different available models of sdlc?
what is the common in all s.o.p (standaed operating procedure)?
What is the difference between GUI Testing,UI testing and Usability TEsting
Hi, this is not a tech question, i have 4 yrs of experience in Mainframe systems, presently as a mainframe tester in pune, i just want to step towards south locatios(preferable hyd), suggest me the best way to get calls from hyd.
what r the measure bugs found in your project??? Give some example abt this.
What is software configuration management?
uses of checklist
Can any body tell me in real time how cookies testing is done. And please tell me the steps.And for cookies testing test cases is needed.
what will be verification and validation test cases for yahoo login page (only functional test cases)? Please explain in details.
Inwhat basis the time is allocated for testing the application?
what is coupling integration testing
What is exploratory testing and when should it be performed?
Hi, I am planing to give ISTQB - Foundation level exam. Can anyone forward the ISTQB materials at laxmi_002@rediffmail.com mail ID.