A and B combinely can do a work in 4 days. If A alone can
do a piece of work 6 days. In how many days B alone can do?
a) 8 days b) 6 days c)10 days d) 12 days
Answer Posted / geetika thakkar
say the work is w and let no of days taken by b is 'x' which
we have to calculate
so work done by a in one day is w/6
work done by b in one day is w/x
a and b together can do work in 4 days ie=(w/6)+(w/x)=(w/4)
solving equation x=12
so no of days taken by b=12
| Is This Answer Correct ? | 9 Yes | 1 No |
Post New Answer View All Answers
Find the Series number: 2,5,9,19,37,..
If 12 box containers require 18 feet of wall space, how many feet of wall space will 30 box containers require?
Using the digits 1,5,2,8 four digit numbers are formed and the sum of all possible such numbers.
In an examination 30% of the students failed in Maths, 40% failed in Science and 25% failed in both the subjects. If 220 passed in both the subjects. Find the number of students appeared in the examination ?
The ratio of length of a rod and its shadow is 1/sqrt(3). Find the angle of elevation.
A work is done by two people in 24 minutes. One of them alone can do it in 40 minutes. How much time will the other person will take to complete it
Find the correct choice if the sum of any 4 consecutive numbers is divisible by a number?
One clock rings 7 O'clock in 7 sec.In how many seconds it will ring 10 O'clock.
The minute hand of a clock overtakes the hour hand at intervals of 64 minutes of correct time. How much a day does the clock gain or lose?
PA and PB are tangents to the circle at A and B respectively and the chord BC is parallel to tangent PA. If AC = 6 cm, and length of the tangent AP is 9 cm, then what is the length of the chord BC?
What Is Kyc?
pls send me andhra bank clerk model papers&syllabus
The ratio between the perimeter and the breadth of a rectangle is 5: 1. What is the length of the rectangle If the area of the rectangle is 216 sq. cm?
What is the attitude
A finishes the work in 10 days & B in 8 days individually. If A works for only 6 days then how many days should B work to complete A's work?