What are the things you prefer and prepare before starting
testing?
Answer Posted / rasul
I prefer:
Reviewed SRS (to write test cases)
Approved Design documents ( for integration testing)
Unit tested code/build
Approved test plan
I prepare:
Identify test conditions
Prepare Test Cases (should be approved before testing)
Rasul
QA Engineer
rasul_Cse@yahoo.com
Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
What is the difference between three tier and two tier application?
Can anybody give me some tips on how to face telephonic interview and Write some expected telephonic questions as a 2+yr exp. in testing. Try to give Ques. that u already hv faced in telephone. Plz Help me out friends.
What are the cases why parameterization is necessary when load testing the Web server and the database server?
when do you escalte issue to your manager?
What is an exit criteria?
Which is the best book to ref. for design the test cases/scenario in manual testing,which gives detailed idea with all the strategies ?
What is exploratory testing and when should it be performed?
Can anybody give me some tips on how to face telephonic interview and Write some expected telephonic questions as a 2+yr exp. in testing. Try to give Ques. that u already hv faced in telephone. Plz Help me out friends.
Can automation testing replace manual testing?
What is bug, deffect, issue, error?
What is Test Design?
How do u go about testing of client server application
how to verify a button size (e.g Login Button) on a web page have same dimension prescribed by Client in UI Testing..??
You must test a trouble report where the problem cannot be reproduced. You tried using various test data files and mutations from the data files the customer sent along with the trouble report. The software does not fail the way it did at the customer's site.
what type of testing techniques are using after accept the build?