Answer Posted / surya
the material should be delivered with in the time other
wise material will be block
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
If you generate bill more than credit limit then what will happen?
In back order process system follows backward scheduling or forward scheduling? please give ur valuable answers
Describe the process flow for a credit memo.
What is an mrp type?
Explain how the shipping pint is determined?
What is the difference between make-to-order production with and without assembly processing?
can one have multiple packing for delivery? answer is yes , but where we maintain this? wt is the process?
What is meant by transfer of data from legacy code to sap?
I have a shopping mall. If a customer comes to my mall and if he purchase or not anything I give him pen free. How we map it in sap?
How can you go for billing?
explain your functional experience prior to sap?
How can a company's structure represent by defining and assigning corporate structure elements in r/3 system and what is the purpose of doing that?
IF u have worked on EDI IDOC, while sending PO to vendor how u connect to the system. Tellme the entire design and steps of the screen. how it looks.When i told we need to create port, partner profile, outbound idoc process. Interviewer not satisfied.
What is information structures? What are the basic types of information it (information structure) comprises of?
Explain the term "fit gap analysis"?