MRP type-
Key the determines wether and how the material is
planned.you have the following options.
-manual re-order point
-automatic re-order point
-fore-cast based planning
-material requirement planning
-master production scheduling.
LOT-SIZE-
Key that determines which lot size procedure, the system
uses with in material planning to caleculate the quantity
to be procured or produced.
Is This Answer Correct ? | 19 Yes | 5 No |
Post New Answer View All Answers
Difference between planned delivery time and gr processing time?
How is scrap material taken care of in sub-contracting?
What transaction code is used to convert planned orders (po) into requisitions in material requirement planning (mrp)?
What are the commonly used movement types in sub-contracting process?
How is material information structured in material master records?
What is purpose of zgr based invoice verification in purchase order?
What is a 'factory calendar'?
How to handle free items in po?
What is a profit center?
What is forecasting in sap system?
How is the pricing of consignment stocks done?
What is the transaction code to access mrp list?
What is the difference between purchase requisition and purchase order?
Differentiate between contract and scheduling agreement
How are batch numbers assigned?