what is the difference between SETON RT & RETURN?

Answer Posted / pratidnya

SETON RT will close files (ODP) that were opened in the
program and frees the space
RETURN - Does not close open files and passes the control
to the caller.

Is This Answer Correct ?    8 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how do I declare a minor?

718


how can I tell when to replace the array?

706


how do I play {insert rpg system here}?

590


give an eg of ACQ-(ACQUIRE),BIT OFF,BIT ON,DEALLOC,DUMP,FEOD,FORCE,MHHZO,MHLZO,MHLLZO,MLHZO,REL,RESET,TESTZ,TESTB,TESTN----GIVE SMALL EXAMPLE TO THE OPCODES...TO UNDERSTAND FUNCTIONING...........

3291


How to call one program from another program in RPG? please help me with the code

1265






If my rpg program has a date field, what extra care I have to take while compiling that rpg program? If the file is keyed and I have declared the file as well as key list properly in my program. Still am getting an error message like "chain/reade operation is not allowed" what may be the case?

625


can you debug ile rpg program using isdb?

741


can anybody help me to solve this problem. the program that i m checking display error message saying "Record format for file AJDSPFFD does not match model file and decimal error. how to solve this problem. The AJDSPFFD is snapshot the AJTLOG that is the audit trail list.

2283


Interviewer asked me write down DDS for load all subfile .can anybody write dds

1026


what do you mean by an input subfile, what are the keywords required?

777


What is the diff bw PF/LF Name and their Record format name? what is restriction in record format then file name?

2521


Assume 2 users are using the same file and first user updates some record in the file. Will the 2nd user will be able to see the updated record or not?

521


what is data area and how it is used in rpg program ?

758


How to handle duplicate error handling in RPG?

1689


Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.

1765