how to choose the cable rating for load (KW)? EXAMPLE.50KW load
Answer Posted / vinod sharma
In a three phase system p=1.732x3xVxIxCOS@
When load is given 50KW
Then I=50000/1.732x3x415x.8
=86A near about
taking some future expectancy you can take a cable of
having 100A capacity.SO by this u can take a cable of 70mm
square in aluminium and 50 mm square in copper
Is This Answer Correct ? | 230 Yes | 138 No |
Post New Answer View All Answers
my UPS suddenly goes off and all panel light also blow off.This happens even main electric supply is not interrupted.After some time it automatically starts functioning normally.Batteries are new.
how can maintain the power factor and why and this is how do work tell us
What is the difference b/w fanuc alpha series 16i and 18i controller. what is stand for i
what is difference between isolation and ultra isolation transformer?, what is the method of testing ?
When calculating the speed of a rotor required for a particular frequency of synchronous generator we use the equation 60f/p Is this p is the number of pole pairs of rotor & do we consider the number of pole pairs in the stator is 1?
How to know vacuum in vacuum cylinder of breaker in working condition
Draw a SLD of HT distribution EB grid up to users Transformer?
PLEASE INFORM ABOUT THE IDEAL TEST RESULTS OF MAGNETIC BALANCE TEST OF TRANSFORMER 33/11 kv DELTA-STAR T/F
What is electrical diversity factor in electrical installations?
what is the standard duration after failure EB power
Why is remote backup preferred to local backup?
234 MVA Generator 3 phase Short circuit current Values required? Gen set Rating-234 MVA, Gen Voltage-18kv, PF;0.8, Xdv:23.5 %, Transformer Rating-18/380KV, 680MVA,Yndd1 two winding, Step up TR, ZT:35.50 %,X/R 4.33 Gen CB Position, CB open ,Disconnected open, Generator Running Voltage 18 Kv, Bi mistakes generator side earth switch Closed during that time short circuit current level in 3 Phase required, and how to test on site 234MVA Generator Short circuit current,
can the measured percentage error during calibration of single phase energy meter be negative?
help me with the question that might be ask on the interview for technical position
i have to install a HT panel, what components, I have to use in this and what will the diagram of that diagram,please tell me each and everything.