I need to perform a 4hr test run in performance center 9.0
there i need to rampup 10 users after 1 hour. I selected
the run tab and added users to down state -> Ready state->
initialise-> Run state. 10 users ramped up successfully for
the next 1 iteration only after that the 10 users
automatically goes to the stop status. But i want the
ramped up users to be carried out for the next 3 hours.
Please help me out how to do the rampup successfully for
the remaining time period.
Answer Posted / rk
You have entervalues in Rampup and Rampdown and dudration
in Design Tab ...
Editschedule---in Design Tab ...
Thanks
RK
Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
What is x-windows?
How is each step validated in the script?
What is remote command launcher?
What are the different sections of the script? In what sequence do these sections run?
What is loadrunner controller?
What is parameterization?
What do you mean by path?
Why we insert the rendezvous point while running the scenario?
During the load test, what is the optimum setting for logs?
What is the load runner testing process?
What the host attributes determine?
What are the element in the loadrunner controller?
What is the difference between hits/second and requests/second?
Where are automatic correlation options set?
What is host?