what is testing , why will be testing ,what is
responsibilities of tester
Answer Posted / sudhakar8
Testing is a Process of executing a Program with an
intention of finding fault,error,failure.
To improve the Quality of the application and bugs get
fixed.
Responsiblities of Tester:
Test Plan preparation.
Test Case preparation.
Test Data Preparation.
Test Case Execution and Defect Tracking.
Test Status reports preparation.
Test Completion report preparation.
| Is This Answer Correct ? | 13 Yes | 0 No |
Post New Answer View All Answers
What is difference between SAN and NAS? How SAN is better than NAS?
Explain what is testing type and what are the commonly used testing type?
Explain beta testing?
What is code review?
Why is the decision table testing used?
Mention what the main advantages of statement coverage metric of software testing are?
How will you log a Defect when you are in the process of executing a test case?
what are all the folders maintained in memory location?
What is a utility?
26). how will know do written test cases are sufficient to validate application of functionality? 27). how will you prepare test data to validate input object? 28). explain defect status? 29). how will know whether the developer accepted you defects or not? 30). explain acceptance test? 31). explain when we stop testing? 32). explain scope of your project? 33). in which module you conducted testing? 34). explain defects which you found in that module? 35). if defect is not reproducible then what information you will provide to developer 36). if developer is not accepted your defect then what you will do?
What is memory leaks and buffer overflows ?
How many effort estimation methods available in market for testing?
i am fresher in manual testing.how to do database testing as a manual tester.suggest me some answers,so that i will have a clear idea adout database testing.
The Following Characterstics posses some XYZ company. * Uses formal standards and policies * Conducts software inspections * Has advanced configuration management and change control * Uses CASE tools * Has a software engineering process group * Gathers metrics on process and quality * Requires that developers have formal software engineering training * Practices continued process improvement Based on aboue , Tell me which CMM Level is the company..? 1. Level 1 - Initial 2. Level 2 - Repeatable 3. Level 3 - Defined 4. Level 4 - Managed 5. Level 5 - Optimizing
Explain dynamic testing?