Answer Posted / vinay
# 1 material master,BOM,Workcenter and routing
and MRP
Is This Answer Correct ? | 1 Yes | 3 No |
Post New Answer View All Answers
a company needs 12 standard values. how it can be maintained?
Can any body explain me why work scheduling view is required for semi finished and finished products?
What are all the steps involved in Variant Configuration?
any one can provide me some sample resume for SAP PP with 0 to 1 year experience?
What are all the settings done for configuring the integration of pp with fico?
What is the use of infogroups?
What is a ‘routing’ in pp?
Mention what is the difference between stock transport order and stock transfer order?
Can’t one material be assigned to more than one operation in a routine?
Explain source inspection.
Explain LTP.
What do you mean by pooled capacity?
What are the levels of batch, explain batch determination process?
List out the basic procedure for dispatching operations in capacity leveling?
What is scope of planning?