How can we access Interactive job LDA in Batch Job?.
and How we can access a file in interactive QTEMP lib in
Batch job?.

Answer Posted / sekhar

QINTER and QBATCH are two different subsystems in iseries
box. interactive job having its own QTEPM and *LDA and batch
having its own.if u signon to QINTER means i.e a job. AS400
creates QTEMP and *LDA for each job. so each SBMJOB having
its own QTEMP and *LDA and your QINTER session having its
own. so you cannot access both at a time.

Is This Answer Correct ?    7 Yes 7 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how do I preserve and clean the array?

677


what is program status data structure?

1391


How to define data area in RPG program? In which scenario multi occurrence DS is use in AS400?

1563


what is data area and how it is used in rpg program ?

758


Set on command is used for closed all opened files , initialize var and release resource , return cmd is used for return to calling program but my req. Is dnt close opened files and resource must released while doing transactions , how can i do this...?

1464






what is an online rpg?

731


How do u design a physical file, when you have 2 Unique fields like for eg in A student file student ID and student examination no both are unique

548


We have job which is running as batch. It takes atleast 06 hours to complete tht job. But I wanna do tht job with in 3 hours?

772


what are the key words you must use when using a subfile?

694


what was the robotech rpg?

686


What is difference between bind by copy and bind by reference?

1732


How can we override a file during runtime in rpg?

690


how do I declare a minor?

718


Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.

1763


How can we know running job is batch or interactive?

658