If the developer rejects that its not abug means then whats
the next step we follow?

Answer Posted / sssss

Normally Developer Rejects the bug in two ways 1. Tester's
Error 2.As per design
1.Tester's Error :This status is given by the Developer
when the tester dont have the functional knowledge and kept
the bug.In such case we will verify the functionality and
it is as per the requirements we will conduct the meeting
and verify that.
2.As per Design:when the requirements are changed and they
are not updated to the testers, in such case he test the
module according to the previous requirements and
encountered with the bug in such case the status is As per
design

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

For any web application, what are the possible login features that should be tested?

809


What are the various techniques in white box testing?

666


Enlist some bug status along with its description?

726


Tell me the advantage and disadvantage of cookies?

798


What are the main key components in Web applications and Client Server applications? and their differences?

1497






If client give you a project then which testing you will perform first

718


Which test cases are written first: white boxes or black boxes?

801


Hello again!! wanted to ask you HOW EXACTLY create stubs and driver in integration testing? 2.whats the difference between integration testing and system integration testing? Thanks!!

1715


what is quality Factor

2028


How do u determine,what to be tested?

1618


consider therez 1 land and it has mango trees in it, what are the tets cases or how will we count no of mangoes on all trees

1591


What icon is used in WinRunner to get an explanation of the syntax of TSL?

1569


how to clarify functional requirements and non functional requirements in a srs?

1577


How to overcome pesticide paradox?

698


What are the different strategies for rollout to end users?

730